Project scheduling software (scriptable, cross-platform, and open source)
GanttPV Home
Why GanttPV? Help Scripts Server Developer Object Role Modeling
Forum

Set Plan Bar Color By Resource

Status

in v0.6

Description

Sets plan bar color, for each task row in the report, based on assigned resources.

How to Use

Requires "Install Resource Plan Bar Color" to edit resource colors. All tasks are updated (it ignores the selection).

How It Works

If multiple people are assigned to the same task, their colors are numerically averaged.
(requires v0.6)

Critique

Replaces manually assigned colors.

Contributors

Brian